Loading Events

« All Events

  • This event has passed.

February 2016 Technical Meeting

Tuesday, February 16, 2016 @ 4:00 pm - 7:00 pm

Pressure Relief Valve Technology and Sizing Improvements for Process Safety Management

Join us on February 16th as we learn from Dave McHugh, of Allied Valve and Joe Baffoe, of Valdes Engineering who will discuss pressure relief valve technologies, relief valve design, the role of relief valves in process safety management, and two-phase relief valve sizing improvements.
Each relief system is unique and requires careful analysis to provide the best solution. There are different types of pressure relief devices including conventional relief valves, bellows, pilot relief valves and rupture pins. Several industry codes regulate relieving devices, such as ASME Section I and Section VIII for steam boilers and pressure vessels and API 520 for the Refining and Petrochemical Industries. OSHA requires operations to maintain records of their relief systems as part of Process Safety Management. Relief valve sizing methods of ASME and API will be discussed, along with two phase flow calculations using the Omega Method, Three-Point Homogeneous Equilibrium Method (TPHEM) and Direct Integration.
David McHugh is Vice president of Allied Valve with Commerce Engineering degree from Drexel University who has over 25 years of experience in the valve industries having worked directly for Durco, Dresser and now one of the owners and leaders at Allied Valve.  He currently sits as member of the NBIC VR subcommittee assessing and recommending pressure relief device code and policy.
Joe Baffoe is a Senior Process Engineer with Valdes Engineering Company. He has over nine years of experience in the specialty chemical and oil and gas industries. He holds a B.S.Ch.E. from Purdue University, a M.S.Ch.E. from Illinois Institute of Technology and is a registered professional engineer in Illinois.
Topics to be Covered:

PRV Introduction
ASME Sec. 1 and VIII, API 520
Power and Refinery PRV Application
Process Safety Management
PRV Sizing Methods
Two-Phase Flow Sizing Improvements

Social Hour Sponsored by: Allied Valve, Inc
Attend this seminar and you can receive 1.0 Professional Development Hours (PDH)
Print Here and Post by the Coffee Machine.

Details

Date:
Tuesday, February 16, 2016
Time:
4:00 pm - 7:00 pm
Event Category:
Website:
https://www.eventbrite.com/e/february-2016-technical-meeting-tickets-20594066407

Venue

Nevins Brewing Company
12337 IL-59
Plainfield, IL 60585 United States
+ Google Map
View Venue Website